Menu Skip to Main Content Home | Contact Us | Jobs | Departments | Policies

Categorical Exclusion

To All Interested Agencies and Public Groups:

As provided by the state environmental review process adopted in the Permanent Rules of the Texas Water Development Board (TWDB) 31 Texas Administrative Code §375, Subchapter E for the Clean Water State Revolving Fund (CWSRF) Program and consistent with the National Environmental Policy Act, 42 U.S. Code §4321, et seq., the Executive Administrator of the TWDB has determined that the proposed action identified below may be exempted from formal environmental review requirements:

City of Fort Worth, Tarrant County, Texas
CWSRF Project Number 72275
Total Board Loan Commitment: $28,000,000
Total Estimated Project Cost:  $4,050,000
Total Estimated CWSRF funds to be used for this project: $3,525,000
Local Funds: $525,000

The City of Fort Worth (City) is proposing to use proceeds from a State Fiscal Year (FY) 2008 CWSRF Tier II loan from the Texas Water Development Board (TWDB) for functional replacement of existing sanitary sewer lines within existing rights-of-way (ROW). Specifically, the proposed project (Contract 72 Part 2 and Contract 74) will involve replacement of approximately 30,000 feet of 6- to 12-inch sewer line with 8- to 12-inch line. The primary method of installation is open cut replacement with some lines being rehabilitated via pipe bursting or pipe enlargement techniques.

The proposed project involves functional replacement of existing lines. All work will be conducted within the existing previously disturbed ROW. This project will not impact wetlands or waters of the United States (U.S.) that are under the jurisdiction of the U.S. Army Corps of Engineers. In addition, no impacts to significant or potentially significant cultural resources or protected species or critical habitat are expected. This Categorical Exclusion is granted because the specified project elements should not entail significant adverse impacts to the quality of the human environment. Documentation supporting this determination is on file at the Fort Worth Water Department and the TWDB.

The exclusion shall be revoked if (1) it is found that, due to changes in the project, the proposed action no longer meets the criteria for an exclusion, (2) evidence is found that the project may have serious environmental effects, or (3) it is found that Federal, State, or local laws are being or may be violated by implementation of the project. The project activities must comply with the following conditions:

  • Standard emergency condition for endangered species; and,
  • Standard emergency condition for cultural resources.

Comments regarding this determination may be submitted to the Director, Project Engineering and Review Division, Texas Water Development Board, Austin, Texas 78711.

Sincerely,

Mark D. Hall, P.E., Director
Project Engineering and Review Division

Bids, Requests & Notifications RSS

ENV 13-04: Removal of Lead-Contaminated Soil and Underground Storage Tank removal from the Bethlehem/United Community Center Project

Status: Closes 1:30 p.m. June 20, 2013


Bid Opening for May 16, 2013

Download the MP3


RFP 13-0166 Depository and Banking Services

Status: Closes June 20, 2013


13-0117 Flexible Pipe Couplings and Adapters

Status: Closes May 30, 2013


02131 - HMAC (2013-8) Surface Overlay

Status:  Closes 1:30 p.m. June 13, 2013


RFP 13-0140 Online Accident Reporting

Status: Closes 1:30 p.m. June 6, 2013


01295: Lake Shore Drive from Wilbarger to Berry CMAR

Status:  Closes 1:30 p.m. June 6, 2013


RFP: Design of Modern Roundabouts

Status:  Closes 5:00 p.m. May 21, 2013


01161: Sendera Ranch Blvd Phase III

Status:  Closes 1:30 p.m. May 20, 2013


00141: Hemphill Street from Lancaster to Vickery CMAR

Status:  Closes 1:40 p.m. June 20, 2013


00702: Randol Mill Road Culvert Improvements

Status:  Closes 1:30 p.m. May 30, 2013


Bridge Repair and Rehabilitation at Nine Locations (2013-25)

Status: Closes 1:30 p.m. May 30, 2013


01494: Contract 2010 STM-E and 01918: CAH Ashland Drainage

Status: Closes 1:30 p.m. May 30, 2013


RFP 13-0144 Human Resources Benefit Consultant

Status: Closes 1:30 p.m. June 6, 2013


RFP: HOME Investment Partnerships Program (HED-4-2013)

Status:  Closes 4:00 p.m. May 27, 2013


02126: HMAC Surface Overlay (2013-6)

Status: Closes 1:30 p.m. May 23, 2013


RFP 13-0133 457 Deferred Compensation Plan Administrator

Status: Closes 1:30 p.m. June 6, 2013


01847: Village Creek WRF Gravity Belt Thickener Addition

Status: Closes 1:30 p.m. May 23, 2013


Past Bids & Notifications

Download weekly bid openings (audio only).

BuySpeed Online

Log In

Capital Projects

Upcoming Projects

Buzzsaw

Obtain construction project documents through Buzzsaw. Documents are available on Buzzsaw when noted in the bid/request posting.

Important Notice

All bids presented on this page are subject to change by way of addendum. Addenda are available through BuySpeed Online or, for construction bids, through Buzzsaw.

It is the Vendor's Responsibility to review any addendum and return it with the submitted bid or proposal response. Failure to review and return an addendum with the bid or proposal may adversely affect the vendor's opportunity for a bid or proposal award.

All tabulations shown here are for informational purposes only and are subject to evaluation. Entries may contain transcription errors and do not reflect an actual award by the city until contract information is posted.



Home | Contact Us | Jobs | Departments | Policies | Subscribe | Media | Employee E-Mail |